By Sabine Lobnig, Apr 02, 2012, 00:00 • 4 minute reading
On 1 November 2011, a new thermeco2 heat pump system for hot water generation and heating was put into operation in the slaughterhouse Zurich. With a capacity of 800 kW, the plant is the largest ever built in Switzerland. The heat pump uses waste heat from the refrigeration machine, ventilation, and compressed air systems as sources that can generate temperatures up to 90 °C. In the overall balance of the slaughterhouse, CO2 emissions can be reduced by approx. 30 %. By
Apr 02, 2012, 00:00
Apr 02, 2012, 00:00
Related stories